I met with our contractor and electrician yesterday morning to walk through our electrical plan. There are so many details to a plan. Walking through it helps to work out what looks good on paper, but doesn't work in reality.
I also got an idea of the timeline for our renovation project to be completed. It could be done as early as the end of April and as late as the end of May. Either way, it's earlier than we thought we'd be able to move in. Peyton and I had set our mind on having everything done by mid-summer. So, we're thrilled to possibly move in sooner!
Other things happening with the house...
- Will, our contractor, met with our engineer this week to talk about adding a steel beam to go over the chimney. They came up with an awesome design that will distribute the weight appropriately around the chimney and will still leave the flue open so we can eventually have a working fireplace.
- Our heating and air conditioning unit for the upstairs is being installed. We've also decided to have the ducts for the downstairs replaced (cha-ching!). There was quite a bit of mold and dirt in the downstairs ducts. And with Peyton's allergies (and Ainsley's suspected ones) it'll be good to have a clean ac/heating system.
- The vinyl floor was ripped up from the bathroom and the hardwood is showing. The floor is in awesome condition! Yeah! I'm super excited to sand and stain all of the floors at the end of this project.
- The heart pine flooring we bought a few weeks back ended up not being as much as we thought. We certainly have a novice eye when it comes to eyeing the square footage of flooring. In our defense there were nails in the boards which made it look like much more. Anywho...the square footage ended up being around 400 sqft. instead of 1200 sqft. (I know, big discrepancy) We emailed the kind woman who sold us the flooring and she has offered to mail back to us a portion of what we paid for it. We really appreciate her willingness to offer that to us. We'll be a little short on the amount of flooring to complete the upstairs, but we hope to find the 50 sqft that we need to complete the space.
Next week...
- Heating and air conditioning, electrical and plumbing.
I'm really looking forward to seeing the outside getting finished. To see the colors and roofing on the house will be satisfying.
No comments:
Post a Comment