Alright, folks. I think we've finally worked out all of the kinks with our plan. Now onto the engineering plan and finding out the cost (which might mean we get to do 1/2 of what we've planned...ugh).
Our 1st floor. So, we still don't know where the HVAC chase will go, but it could go near the fireplace, which would leave the downstairs a little less open than we planned. The HVAC subcontractor will be making that decision down the road. And, we've turned the fridge toward the kitchen for my obsessive need for a work triangle.
Asher's room is Bedroom 2. So, his closet has moved from the last plan. Otherwise everything else will stay the same.
Now we hope and pray that we'll be able to stay in budget with all we have to do. What's our budget? I can't remember if I mentioned that...it's $80,000. We're going to work from the top down, making sure to get the 2nd floor as complete as possible and then doing the changes downstairs.
On other Crump news, Asher and Ainsley are giddy about Halloween. Ainsley plans to be a ladybug (I think this makes the 3rd year in her short life she's been a ladybug) and Asher will be the boy version of a witch (whether that's a warlock or a wizard). Fun! Pictures will follow next week.
2 comments:
How much do I love seeing a floorplan??? This was so fun to look at...and I wish you guys a lot of fun and very few tears as you embark on this new adventure!!
Hugs,
Robin
So fun to watch this adventure unfold!! I wish you all the very best as you embark on this journey!!
Love,
Robin
Post a Comment